Water treatment plant 1200 l/s Harbour of Monfalcone (GO)
Porto di Monfalcone (GO)
Supply, installation, and assembly of a continuous water treatment system with a flow rate of 1200 l/s, contained within a single tank measuring 2861 x 604 x 348 cm (length/width/height), at the port of Monfalcone (GO). Installation duration: 10 days.